Traditional & renewable energy >> Energy efficiency >> Water & environment
 
400 kV Morvedre substation,
the link-up point with the Balearic Islands. Valencia Red Eléctrica is the leading power transmission company in Spain and it’s responsible for management of the technical aspects of the Spanish electricity system. It owns most of the Spanish high voltage transmission grid (400 & 220 KV). Euroconsult has carried out 86 site supervision and construction management, 19 detailed engineering and 30 geotechnical studies for civil works of 400 and 220 kV electrical substations in the last 6 years, for Red Eléctrica.
 
La Breña II dam. Córdoba. Spain
With a height of 119 m, and RCC volume of 1.4 million m³ -out of a total of 1.6 million m³ of concrete placed-, La Breña II is the largest RCC dam built in Europe. Euroconsult Group has provided site supervision and inspection services for the Pumping and Turbine-Station, equipped with 6 pumps of 7.75 MW, 2 of 2.1 MW and 2 turbines of 16 MW.
 
Ciudad Real Water Treatment
Plant Euroconsult
contract team has developed the detailed design, technical advisory, site supervision, environmental services and health and safety works.

This plant has a design capacity of 60,480 m³/day of water for human consumption. It includes the pipeline network from the Gasset dam, of 11 km long and 800 mm diameter.
 
Storm drainage system in
Pozuelo (Madrid)
Euroconsult has designed a storm drainage system including 4 kilometres of 4,50 m diameter subterranean drainpipe to be excavated with a tunnel boringv machine. It is one of the most important drainage system designs in Madrid. It serves 6.600 residences in an area of 5 square kilometres.
 
Desig n of inert landfill B-9.
Boroa-Igorre road
The design of the project Boroa-Igorre road, in Vasc Country, Spain, supposes an excess of soil from excavation of 1,330,000 m³ .The B-9 inert landfill was designed for 560,000 m³ , taking into account all the environmental concerns. The result was a sustainable design, an environmental-friendly design.
 
Torres de La Alameda
Wast e water treatment plant.
This plant has a design capacity of 26,000 m³/day of waste water, with a total amount of the Project of 19 million euro.

Euroconsult provides construction management and testing.